Building the beautiful game - Lessons from stadium construction - Part 4

The stadium that never sleeps: Making the 365-day dream a reality

There is a distinction that tends to get lost in the excitement surrounding a new stadium project. A stadium does not need to host events every day of the year to anchor a destination that attracts people year round. The two objectives are related but not the same and confusing them at the outset can lead a club to build the wrong thing altogether. Today, stadia might equally be expected to be concert venues, conference centres, tourist attractions, hospitality destinations, shopping centres and community hubs, all while keeping the pitch immaculate for Saturday’s 3pm kick-off. Even the most tactically versatile manager might struggle to accommodate all of that in one formation.

But the ambition makes sense. Stadia represent enormous investments in land, infrastructure and facilities. With a relatively limited number of home fixtures each season, clubs are increasingly looking at how those assets can work harder beyond the final whistle and also generate "ripple effect" benefits for the wider community beyond the stadium estate. For some clubs, success might mean filling the stadium with concerts, conferences and hospitality events. For others, the greater opportunity may lie outside the turnstiles, using the stadium as the centrepiece of a wider development incorporating homes, shops, leisure facilities and public spaces.

In this fourth instalment of our Building the Beautiful Game series, we consider how clubs can turn that ambition into reality, and why the right commercial game plan, development brief and contractual framework are essential to getting the result.

1. The game plan: 365-day venue or 365-day destination?

There is no universal blueprint for a successful stadium strategy. The starting point should be a clear understanding of what the club is trying to achieve whilst also being realistic about what can be constructed acknowledging planning and licencing constraints, budget and the feelings of the surrounding community and stakeholders. The 365-day venue focuses on maximising the use of the stadium itself through concerts, conferences, hospitality, tourism and other events between fixtures. The 365-day destination takes a broader view. Rather than relying on the stadium alone, it uses the venue as an anchor for residential, retail, leisure and commercial development that creates activity throughout the week, regardless of what is happening inside the ground. The approaches are not mutually exclusive, and successful developments may combine elements of both. But treating them as the same proposition risks producing a development brief that serves neither particularly well. Tottenham Hotspur Stadium offers an ambitious example of the multipurpose venue approach. Its retractable grass pitch reveals an artificial surface beneath, allowing the stadium to accommodate NFL fixtures, concerts and other events while protecting the football pitch. It is a remarkable feat of engineering, but its real significance lies in how the design supports the stadium’s intended commercial uses. The venue was built for the life it was expected to lead. Of course, not every club needs an NFL-ready stadium or a retractable pitch.

Location matters enormously. A city-centre stadium with strong transport connections, nearby hotels and an established visitor economy may be well placed to attract concerts, conferences and international visitors. A club in a predominantly residential area might find that hospitality, local business events or community facilities offer more realistic opportunities, particularly where noise restrictions or transport capacity constrain major events. For clubs with land available around their stadium, residential development, retail, restaurants and offices may present opportunities to generate activity and value even when the stadium itself is quiet. And these considerations are not confined to the top flight. Ambitious clubs further down the sporting pyramid, particularly those accustomed to punching above their weight, have every reason to explore opportunities to diversify revenue. For clubs operating with tighter budgets, making existing assets work harder may be especially important.

Is the priority to increase operating income, unlock land value, improve the supporter experience or create a broader regeneration opportunity? Different objectives require different development strategies. After all, there is little point signing a world-class striker if what the team really needs is a dependable left-back.

2. Team selection: turning ambition into a deliverable brief

Once the commercial strategy has been established, the next challenge is ensuring that the development can deliver it. This is where construction lawyers and the wider project team need to get off the bench. A stadium intended to host concerts alongside football will have different requirements from one designed primarily around matchday operations. Heavy staging equipment, specialist power supplies, production vehicles, acoustic treatment and pitch protection can all influence the design. Conference and hospitality facilities may require flexible layouts, independent access, catering infrastructure and technology capable of supporting different events. Mixed-use development introduces further considerations where residential, retail and leisure facilities must operate independently of the stadium. These are not simply matters of architectural preference. They have implications for construction cost, programme and long-term operation. Consider a club whose business case assumes that a same-day conversion of the stadium from football to concert configuration (something that many international touring operations now consider standard). Not being able to deliver that turnaround time may affect the ability of that venue to attract major performers, but there will be a knock-on effect for access routes, building services, equipment storage and pitch protection systems. If the conversion period is fundamental to the commercial model, it should be translated into a defined performance requirement, supported by appropriate testing and acceptance procedures. Otherwise, the club could receive a stadium technically capable of hosting concerts but which takes so long to convert that the events calendar becomes commercially unworkable. The contractor may have delivered precisely what the contract required. The completed stadium simply does not support the business case that justified the investment. A rather expensive own goal.

The same principle applies to wider development requirements, including flexibility for future uses. Commercial objectives need to inform the Employer’s Requirements, consultant appointments and allocation of design responsibilities. Where elements remain unresolved at contractor appointment, the parties need clear arrangements for developing and agreeing those requirements. A vague instruction to deliver a “world-class multipurpose stadium” may sound impressive in a board presentation. It is rather less useful when a contractor is trying to establish precisely what it has been asked to price, or when a dispute about what was promised arises three years later.

The objective is not to make the construction team responsible for commercial success. It is to ensure that the completed development is capable of supporting it.

3. Fixture congestion: making the operating model work

Even the best-designed stadium needs an operating model that works in practice. For clubs pursuing an events-led strategy, the sporting calendar presents an obvious challenge. A major concert may require several days for installation, rehearsals and dismantling. The performance itself might last only a few hours, but the stadium can be occupied for considerably longer. Additional events bring costs associated with staffing, security, maintenance, utilities and converting facilities between uses. Then there are the considerations beyond the stadium boundary.

Planning permissions may restrict event numbers, operating hours or noise levels. Transport capacity and the impact on neighbouring residents may impose further constraints. Real Madrid’s redeveloped Santiago Bernabéu provides a pointed reminder of the importance of these issues. Despite its sophisticated multipurpose design, the stadium’s concert programme encountered noise complaints from local residents. The club, in one of its famous 'Comunicado Oficiales', announced the provisional rescheduling of concerts in September 2024 as part of measures to ensure strict compliance with municipal regulations. The lesson is not that clubs should temper their ambitions. Rather, the practical and regulatory ability to operate a venue is every bit as important as its physical capabilities. A world-class concert facility is of limited commercial value if the proposed events cannot take place on the terms assumed in the business case.

Early engagement with planning authorities, transport providers, event operators and neighbouring communities can therefore be as important as the design itself. The objective should be to establish a realistic operating model, test it against the planning and regulatory environment and ensure that the development strategy supports it.

4. Building beyond the touchline: the legal architecture of mixed-use development

For some clubs, the greatest opportunities may lie outside the stadium entirely. A sporting venue can anchor a wider development, attracting investment and supporting residential, retail, leisure and commercial uses that create activity throughout the week. This can also open opportunities to collaborate with local authorities, investors and development partners, particularly where the stadium forms part of a broader regeneration programme. But the wider the ambition, the more important it becomes to get the legal architecture right. Consider a club developing a new stadium alongside residential buildings, shops and public spaces. The stadium may need to open in time for the start of a football season, while construction of the surrounding development continues for several years. How do you safely accommodate tens of thousands of supporters while construction traffic continues to access neighbouring sites? Who is responsible for temporary access arrangements, utilities, shared public spaces and security? What happens if delays to one part of the development affect another? And who picks up the bill?

These questions need to be addressed through the development agreements, construction contracts and infrastructure arrangements established for the project. Shared roads, utilities and public spaces create shared responsibilities. Their construction, funding, maintenance and use may involve parties whose commercial interests do not entirely align. Rights of access must be secured, responsibilities allocated and arrangements established for what happens when something goes wrong. Phasing adds another layer of complexity. Where the stadium opens before the surrounding development is complete, the project needs arrangements for separating operational areas from continuing construction, maintaining essential services and managing the transition as later phases are delivered. The interfaces between different contractors, landowners and operators must also be understood. A delay or failure in one part of the development should not become an unexpected problem for everyone else. These are matters where careful procurement, development structuring and contractual coordination can make a significant difference. The challenge is not simply to deliver a stadium and several neighbouring buildings. It is to ensure that the different elements can be constructed, opened and operated together. A successful football team needs more than eleven talented individuals. It needs a system in which everyone understands their role and responsibilities. The same is true of a successful stadium-led development.

5. Extra time: building for the next generation

Stadia are long-term assets, but the commercial opportunities available to them will inevitably change. Technology will evolve, consumer expectations will shift and new forms of entertainment and leisure may emerge. A development designed today may need to accommodate uses its owners have not yet contemplated. That makes flexibility an important consideration. But future-proofing should not become an excuse to incorporate every conceivable feature into the original design. Every additional structural provision, specialist installation or adaptable space carries a cost. Not every investment in theoretical flexibility will generate a return. The better approach is to identify where adaptability is likely to create genuine long-term value. That might involve hospitality spaces capable of reconfiguration, infrastructure that can accommodate future technology upgrades or development plots that can support different uses as market conditions evolve. Where those capabilities form part of the commercial strategy, the design and contractual documentation should define what is being delivered and how it will be assessed. Otherwise, the aspiration to create a “future-proof stadium” risks becoming another set of goalposts that move during construction. The trick is not to predict the next 30 seasons. It is to build a squad capable of adapting when the game changes.

The final whistle

The emergence of the 365-day stadium reflects an important shift in how clubs think about their physical assets. Stadia are no longer simply places to watch sport. Increasingly, they are commercial investments capable of supporting a much wider range of activities and acting as catalysts for regeneration. But there is no single winning formation. For some clubs, the answer will be concerts, conferences and hospitality. For others, it may be residential development, retail, leisure or a broader mixed-use destination. The distinction between the 365-day venue and the 365-day destination matters from the very beginning. The commercial strategy drives the development brief. The development brief informs the contractual framework. And that framework helps determine whether the ambition survives contact with construction.